Process specification
- Perhaps the concept of the process ‘signature’ equates to the establishment of a process specification - that is, a series of requirements which need to be met if the process is to be considered ‘under control’?
- Just as parametric release implies the removal of critical end-product testing, perhaps the natural corollary is to transfer the critical specification from the product to the process?