Radiation-Emitting Products

Multiple Dates for the Medical Physicist Survey

Policy Guidance Help System logo

If the survey is conducted over a period of time, all dates of the individual parts should be indicated. The survey date that the inspector should enter in the laptop should be the date that corresponds to the date that the last required test is completed. The date of the survey corresponds to the date of the last test, not the date on the written report provided to the facility. If any individual part is more than 14 months old at the time of the inspection, the inspector should enter the date of that part as the date of the survey and the facility would be cited for having an overdue survey.

Page Last Updated: 08/07/2014
Note: If you need help accessing information in different file formats, see Instructions for Downloading Viewers and Players.